HS-125 CABLE CUTTING Steel

Item : HS-125

HS-125 CABLE CUTTING Steel

HS-125 CABLE CUTTING Steel

■ For cutting copper and aluminium conductors as well as multiple stranded cables
■ Not suitable for steel wire and wire ropes
■ Clean and smooth cut without crushing and deformation
■ Favourable transmission ratio due to double lever
■ Blade: high-grade chrome vanadium electric steel, forged, oil-hardened, replaceable blades
■ Handles material: Steel

CRIMPING TOOL PARAMETERS
Cutting capacity                                           125mm²
Length                                                              300mm
Weight                                                                  0.7Kg

hs-125-cable-cutting

Q:How to guarantee my order and payment ?
A:Ezitown has Alibaba trade Assurance,100% refundable if any quality or delivery problem.

Q:How to return the goods if meet any problem ?

A:we have DHL and Fedex account for return goods.buyer no need to pay any shipping cost for returning. Can contact our salesman to operate.

Q:Why Ezitown price is competitive, and quality seems rather good ?

A:because we have been manufacturing more than 20 years, we know what price and Quality buyer can sell well in market.the wholeseller have suitable profits

Q:Can we order many items and make combine shipment ?

A:we can combine many items,and deliver by courier/sea/land/air etc. pack well.

Q:Can I order the cabinet/enclosure/box and the wiring material from you or other supplier,you make wiring and assembly for us ?

A:we have egineering, wiring and assembly team for low voltage/medium voltage/high voltage/DC control .can make drawing and diagram to confirmation and proceed the assembly.we have unite nation project in regular assembly.

Q:How can I make our own brand for my order ?

A:we supply OEM service if order quantity meet the OEM MOQ , contact to know the exactly quantity for your item

Q:What is the delivery if I make payment ?

A:Almost all items we keep in stock.and we have many order every day , We need 1-3 working days to packing and make delivery.OEM packing will be longer time.